4.0

Out of 1 Ratings

Owner's of the ProForm Hot Tub 831.21002 gave it a score of 4.0 out of 5. Here's how the scores stacked up:
  • Reliability

    4.0 out of 5
  • Durability

    4.0 out of 5
  • Maintenance

    4.0 out of 5
  • Performance

    4.0 out of 5
  • Ease of Use

    4.0 out of 5
of 20
 
1. Before beginning assembly, be sure that you
have read and understand the information in the
box above and on the previous page.
Remove the two cover screws from the access
cover. Remove the access cover from the Spa Unit
(15) by sliding the access cover down and pulling
the bottom of access cover away from the Spa Unit.
Be careful not to damage the spa shell.
Remove the Power Cord with the GFCI (9) from
inside the Spa Unit (15).
2. Locate and check the position of the cut-off valves.
Occasionally the valves will be closed at the factory
during manufacturing. The cut-off valves must be
open for proper spa operation. To open the valves,
hold one of the handles and turn the handle until
you can pull it out to the open position. Open the
other valve in the same manner. WARNING: THE
MOTOR WILL BE DAMAGED IF IT IS OPERATED
WITH THE CUT-OFF VALVES CLOSED.
Close the valve knob on the drain hose. Thread the
drain plug into the Pump Motor (11). Tighten the
pump fittings.
Re-attach the access cover (not shown) to the Spa
Unit (see step 1 above).
3. Wipe out the spa shell using a damp cloth. Remove
the two warning decals (not shown) from the spa
shell. Before you fill the RESTORATION 2.0, be
sure that it is in the position you want, and that it
can be easily serviced, if needed. Once the spa is
filled with water, it must be drained to be moved.
Using a garden hose or other clean water source,
begin filling the RESTORATION 2.0. The water tem-
perature does not matter; however, if you use warm
or hot water, the spa will be ready to use sooner.
Fill the spa, until the water reaches the fill line. Do
not overfill the spa.
SET-UP AND ASSEMBLY
Before beginning assembly, carefully read the
following information and instructions:
¥ Place all parts in a cleared area and remove the
packing materials from the spa shell; do not dis-
pose of the packing materials until assembly is
completed.
¥ Assembly requires two people.
¥ Read each assembly step before you begin.
¥ During assembly, make sure that all parts are ori-
ented as shown in the drawings.
TOOLS REQUIRED FOR ASSEMBLY:
¥ Your own phillips screwdriver
¥ You may also need a hammer
Fill to Here
Cover Screws
15
9
1
Cut-off
Valve
Pump
Fittings
Cut-off
Valve
Drain
Plug
Drain Hose
Valve
Knob
2
3
11
8
Access Cover